New Hall

Farmak - Nová halaThe second fundamental building of our chemical production process. Individual manufacturing apparatus are not structurally separated. Only the majority of separation units and the ether handling apparatus are. At this moment, production units consist of these reactors:

  • PJ 1.2 + PJ 2.5 (9 reactors 500 – 4 000 L; production predominantly before the critical step)
  • PJ 1.3 (6 reactors 1 000 – 6 300 L; production before the critical step)
  • PJ 1.4 (3 reactors 1 000 – 2 500 L; production predominantly before the critical step)
  • PJ 2.1 (4 reactors 500 – 1 600 L; production before the critical step)
  • PJ 2.4 (4 reactors 450 – 1 600 L; production before the critical step)
  • PJ 2.6 (3 reactors 1 000 – 1 600 L. production after the critical step)
  • PJ 2.9 (2 reactors 250 a 500 L; production of ethanolic solutions HCI)

This production is regularly inspected by the state agency (SUKL) and is approved for GMP production. In addition to this inspection, it is also approved by TÜV Süd in compliance with ISO 9001.

 